No Exceptions Leadership
Company Planning at Buildings
- Author: Vários
- Narrator: Vários
- Publisher: Podcast
- Duration: 0:21:16
- More information
Informações:
Synopsis
Weekly Company Drill Building Familiarization This drill is a size up and familiarization drill. It can be broken up into several parts and get as much information gathered as possible. The objective of this drill is to identify specific hose length stretches for large complexes or buildings that may test the ability of your typical 150' or 200' pre-connect hose line. Share your information with the other companies. Instructions Gather some utility or search rope. We use three, 100 foot sections of 9mm search rope in a bag. Park where you would normally park if there were an incident. Tie off at the truck and stretch to the most remote area you can access. We tie off knots every 25 feet to help us figure out how far we are. Document distances going up stairs, over hand rails, special considerations, etc. Stretch to the back simulating a large blitz line. Special Considerations Access issues for apparatus Water supply location and challenges Forcible Entry Floor plan challenges Rear and remo